Origin Energy has selected Capstone Microturbines to deliver 3MW for the first stage of its new Talinga facility.
The Capstone Microturbines will be delivered in containerised 1MW modules, the largest size offered by Capstone and the first of their kind in Australia. Capstone Microturbines were selected after an extensive evaluation determined that the long maintenance interval and high operating efficiency offered by Capstone delivered the lowest whole of life costs. They will also be the largest single Capstone Mictroturbine installation in Australia.
| < Prev | Next > |
|---|
2025
2023
2022
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2003
Aquatec Maxcon acknowledges the Traditional Owners of country throughout Australia and we recognise their continuing connection to land, waters and culture. We pay our respects to their Elders past, present and emerging.