Western Downs Regional Council has awarded Aquatec Maxcon the Design and Construct Contract of a new Waste Water Treatment Plant at the existing Wandoan site for a combined flow of 450m3/day.
The upgrade is required to meet the projected potable water demand of the township of Wandoan. The increase in demand is driven by Xstrata Coal Queensland.
The new Treatment Plant will consist of a new Activated Sludge Treatment Plant with Inlet Works, Grit Channel, Septic Waste Pre-treatment System, Aerobic Solid Digester, Solid Dewatering Equipment, Chemical Dosing System, MCC and associated treatment infrastructure.
| < Prev | Next > |
|---|
2025
2023
2022
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2003
Aquatec Maxcon acknowledges the Traditional Owners of country throughout Australia and we recognise their continuing connection to land, waters and culture. We pay our respects to their Elders past, present and emerging.