Aquatec Maxcon were engaged to design and construct the Re-Waste Facility No.1 linked to the Aurora sewage treatment plant (STP) in 2014.
Our unique design solution diverts 33,000t of commercial food waste from landfill each year. This generates enough biogas to power the existing Aurora STP and recycled water facility with surplus energy (approx. 78%) to be sold or exported to the electricity grid. The facility is now nearing final testing in March 2017, and the plant is providing surplus biogas to the gas engines at the Aurora plant.
Re-Waste Facility No.1 has had an operations team running the facility since mid-2016 whilst organic wastes are delivered to the site. Aquatec Maxcon has been awarded the operations and maintenance contract for a period of two (2) years, with an extension if the facility continues to operate effectively.
| < Prev |
|---|
2025
2023
2022
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2003
Aquatec Maxcon acknowledges the Traditional Owners of country throughout Australia and we recognise their continuing connection to land, waters and culture. We pay our respects to their Elders past, present and emerging.